Yard of Concrete: How Many Bags, How Much It Weighs, Bags vs Ready-Mix
A cubic yard of concrete explained: 45 bags of 80 lb mix, 60 of 60 lb, how much a yard weighs, and when ordering ready-mix makes more sense than mixing bags.

Affiliate disclosure: product links on this page go to Amazon or to the maker's own store. As an Amazon Associate we earn from qualifying purchases, at no extra cost to you; links to makers' own stores earn us nothing. No retailer or brand sees our picks before they are published or has any say in them. How we choose.
A cubic yard of concrete is 27 cubic feet, which is 45 bags of 80 lb concrete mix, 60 bags of 60 lb or 90 bags of 40 lb, using Quikrete's published yields. At Quikrete's unit weight of about 140 lb per cubic foot, a yard of concrete weighs about 3,780 lb. Past a yard or so, mixing bags by hand gets slow, which is where ready-mix comes in.
Bags per cubic yard
| Bag size | Yield per bag | Bags per yard | Weight of dry mix per yard |
|---|---|---|---|
| 90 lb | 0.675 cu ft | 40 | 3,600 lb |
| 80 lb | 0.60 cu ft | 45 | 3,600 lb |
| 60 lb | 0.45 cu ft | 60 | 3,600 lb |
| 50 lb | 0.375 cu ft | 72 | 3,600 lb |
| 40 lb | 0.30 cu ft | 90 | 3,600 lb |
Yields from Quikrete's Concrete Mix data sheet; bags and weights are our arithmetic. Whichever bag you buy, a yard means moving close to two tons of mix, plus water.
What a yard covers
- 81 square feet at 4 inches thick (a 9 by 9 ft pad).
- About 108 square feet at 3 inches thick.
- About 20 holes 10 inches wide and 30 inches deep.
Run your own numbers in the concrete calculator.
Bags or ready-mix?
| Bagged mix | Ready-mix truck | |
|---|---|---|
| Best for | Post holes, footings, steps, small pads | Slabs and driveways |
| Labor | Lifting, mixing and placing every bag | Placing and finishing |
| Timing | Your pace, batch by batch | The truck's schedule; be ready |
| Equipment | A mixer or tub, wheelbarrows | Wheelbarrows or a power barrow, finishing tools |
Parts of a yard
| Volume | Cubic feet | 80 lb bags | 60 lb bags |
|---|---|---|---|
| 1/4 cubic yard | 6.75 | 12 | 15 |
| 1/2 cubic yard | 13.5 | 23 | 30 |
| 3/4 cubic yard | 20.25 | 34 | 45 |
| 1 cubic yard | 27 | 45 | 60 |
What a yard of bags asks of you
Forty-five 80 lb bags are 3,600 lb to carry from the pallet. At Quikrete's starting rate of 6 pints per bag they take about 34 gallons of water, and up to about 51 gallons at its 9 pint maximum (our arithmetic). Quikrete's typical strengths for the mix are 2,500 psi at 7 days and 4,000 psi at 28 days, tested at a 2 to 3 inch slump, which is a stiff mix. Adding water beyond Quikrete's maximum to make the work easier gives strength away.
Ordering ready-mix
The National Ready Mixed Concrete Association's ordering guide sets out what a producer needs from you and what to expect:
- Quantity: concrete is sold by the cubic yard. Order 4 to 10 percent more than your estimate from the plan dimensions, and avoid coming back for a small clean-up load.
- Truck size: mixers carry 8 to 12 cubic yards.
- What it is for: give the use, so the producer can match a mix. Specified strengths of 3,500 to 5,000 psi are typical, and concrete that will freeze in service should be air-entrained.
- Slump: 3 to 5 inches suits most work.
- Access: a loaded truck weighs about 80,000 lb and may not manage loose dirt or a residential curb. Say so when you order, and plan how the concrete gets from the truck to the forms.
- Timing: concrete normally sets within two to eight hours of mixing. Have the forms, the tools and the help ready when the truck arrives.
Weather on pour day
Bags or truck, the calendar matters. Quikrete says to protect concrete from freezing for the first 48 hours, with plastic sheeting and insulation blankets if the temperature is expected to fall below 32 F. The association's cold-weather guide says fresh concrete freezes below about 25 F, that concrete which freezes can lose more than half its potential strength, and that it needs protecting until it reaches 500 psi, about two days after placing.
Moving and curing a yard
A yard of wet concrete weighs about 3,780 lb. If it has to travel from the mixer or the truck to the forms, that is 11 trips with a barrow carrying 350 lb, or 7 at 573 lb (our arithmetic); see power wheelbarrows. Once it is placed and finished, the work is not over. Quikrete says to start curing as soon as possible and keep it up for 5 days at 70 F or above, or 7 days between 50 and 70 F. The National Ready Mixed Concrete Association gives a typical curing period of 3 to 7 days and says concrete left dry can lose as much as half its potential strength.
The association's guide lists the ways to do it: keep the surface wet with a sprinkler or soaker hose without letting it dry between wettings, cover it with wet burlap kept weighted and damp, seal it under plastic sheeting, or spray on a curing compound. For a yard poured from bags over an afternoon, the first batches are ready to cover before the last are finished.
Curing compounds have a limit of their own: Quikrete says not to apply one if rain or temperatures below 50 F are expected within 24 hours, and not in late fall on surfaces that will get de-icers.
Mixer sizing
Quikrete says to allow at least 1 cubic foot of mixer capacity for each 80 lb bag mixed at one time. A 4 cubic foot drum therefore takes four bags a batch at most, and fewer where the maker states a lower mixing capacity, so a yard of 45 bags is a dozen batches or more. See how to mix concrete.
Frequently asked questions
How many 80 lb bags of concrete are in a yard?
45. Quikrete's 80 lb bag yields about 0.60 cubic feet, and a cubic yard is 27 cubic feet.
How many 60 lb bags make a yard of concrete?
60 bags. Quikrete's 60 lb bag of Concrete Mix yields about 0.45 cubic feet, and 27 cubic feet divided by 0.45 is 60.
How much does a yard of concrete weigh?
About 3,780 lb, using Quikrete's unit weight of about 140 lb per cubic foot for its Concrete Mix.
How many square feet does a yard of concrete cover?
About 81 square feet at 4 inches thick, or about 108 square feet at 3 inches.
How many yards does a concrete truck hold?
The National Ready Mixed Concrete Association says truck mixers carry 8 to 12 cubic yards. It advises ordering 4 to 10 percent more than your estimate and avoiding small clean-up loads.
Sources
- Concrete Mix No. 1101 data sheet, Quikrete
- Quikrete Concrete Mix product page, Quikrete
- CIP 31: Ordering Ready Mixed Concrete, National Ready Mixed Concrete Association
- CIP 27: Cold Weather Concreting, National Ready Mixed Concrete Association
- CIP 11: Curing In-Place Concrete, National Ready Mixed Concrete Association
Cover photo: Concrete work, CC0 1.0, via rawpixel. Cropped.
Related guides
Concrete Block Calculator: How Many Cinder Blocks and Bags of Mortar
Blocks, 80 lb bags of mortar mix and courses for a standard 8 x 8 x 16 block wall.
Concrete Calculator: Cubic Yards and Bags for Slabs, Footings and Post Holes
Volume in cubic feet and yards, bag counts by size, and the weight of the wet concrete.
Concrete Mixers for Home Projects: Drum and Poly Drum Cement Mixers (2026)
Five electric drum mixers, how many bags each really takes, and steel vs poly drums.